Projects
The Gavmishan Bridge

The Gavmishan Bridge

Address
The Intersection of the Darreshahr-Pol-Dokhtar Road with Seymareh River, Darreh Shahr County, Ilam Province
Length
180 meters
Width (each deck)
12.75 meters
Base Height
30 meters
The Contract Owner
The General Road and Urban Development Department of Ilam Province, Ministry of Road and Urban Development
Start
December 14, 2025
Duration
24 Months
Finish
Currently Underway
Pictures
  • The Gavmishan Bridge
  • The Gavmishan Bridge
  • The Gavmishan Bridge
  • The Gavmishan Bridge
  • The Gavmishan Bridge
  • The Gavmishan Bridge
  • The Gavmishan Bridge
  • The Gavmishan Bridge